亚洲啪啪综合av一区,国产香蕉视频在线播放,国产色xx群视频射精,亚洲丁香婷婷久久一区二区

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

久久久久亚洲av无码专区导航| 亚洲精品国产摄像头| 久久国产成人精品av| 人妻献身系列第54部| 国产三级精品三级在线观看| 亚洲乱码日产精品一二三| 老鸭窝视频在线观看| 熟妇人妻av中文字幕老熟妇| 国产在线不卡一区二区三区| 老色鬼在线精品视频| 亚洲色无码国产精品网站可下载| 国产精品成人无码久久久久久| 国产精品天天在线午夜更新| 三年片免费观看影视大全视频| 色妞www精品视频| 亚洲成a人片在线观看www| 久久国产色av| 国产成人精品三级麻豆| 午夜无码国产理论在线| 无码国产精品一区二区免费式芒果| 日本另类αv欧美另类aⅴ| 日韩精品无码一区二区三区四区| 艳妇乳肉豪妇荡乳av无码福利| 精品久久久久久无码人妻热| 忘忧草社区www日本高清图片| 中文字幕 人妻熟女| 边添小泬边狠狠躁视频| 成人片黄网站a毛片免费| 精品国产精品久久一区免费式| 肉体裸交丰满丰满少妇在线观看| 夜夜添无码一区二区三区| 最近免费中文字幕中文高清6| 久久精品aⅴ无码中文字字幕重口| 一二三四在线观看免费视频| 天天爽夜夜爽人人爽| 五十路熟妇高熟无码视频| 一本色道久久综合狠狠躁| 极品新婚夜少妇真紧| 国产∨亚洲v天堂无码久久久| 少妇久久久久久被弄高潮| 亚洲av乱码一区二区三区林ゆな|