亚洲啪啪综合av一区,国产香蕉视频在线播放,国产色xx群视频射精,亚洲丁香婷婷久久一区二区

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號(hào) 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

国产成人卡2卡3卡4乱码| 国产在线精品一区二区三区直播| 国内精品久久久人妻中文字幕| 色噜噜久久综合伊人一本| 亚洲精品天堂成人片av在线播放| 人妻久久久一区二区三区| 久久99精品国产麻豆蜜芽| 岳毛多又紧做起爽| 国产在线拍揄自揄拍无码视频| 乱码1乱码2美美哒| 18禁裸男晨勃露j毛网站| 色噜噜狠狠色综合av| 中文字幕乱码人妻无码久久| 伦伦影院午夜理论片| 小宝极品内射国产在线| 免费观看又色又爽又黄的韩国| 极品少妇被猛的白浆直喷白浆| 亚洲 日韩 欧美 成人 在线观看| 午夜成人亚洲理伦片在线观看| 免费精品一区二区三区第35| 老少交欧美另类| 久久狠狠爱亚洲综合影院| 欧洲日本一线二线三线区本庄铃| 99精品国产一区二区三区| 乱精品一区字幕二区| 亚洲第一se情网站| 国产成人aaaaa级毛片| 手机在线观看av片| 偷拍激情视频一区二区三区| 久久精品日韩av无码| 国产综合无码一区二区色蜜蜜| 本道天堂成在人线av无码免费| 99久久伊人精品综合观看| 亚洲爆乳精品无码一区二区三区| 成人白浆超碰人人人人| 国产亚洲人成a在线v网站| 亚洲一区二区三区四区五区六| 一本久久伊人热热精品中文字幕| 欧美日韩国产精品自在自线| 亚洲精品无码不卡在线播放he| 人妻夜夜爽天天爽三区麻豆av网站|